New Bridge Installed at Sutter Medical Center

This is an archived article and the information in the article may be outdated. Please look at the time stamp on the story to see when it was last updated.

SACRAMENTO—

Crews maneuvered a 66,000 pound bridge through the streets of downtown Sacramento early Saturday morning.

Marin Austin was up early to capture the move.

Work isn’t quite done on the bridge. Crews will be working for the next 48 hours to attach the pedestrian bridge to both sides.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s